Clarks Beach Breakwater + Te Toro Point Managed Re

Scope of works

Clarks Beach Breakwater

Removal of existing breakwater (old concrete and rubble), install new basalt rock breakwater with concrete footpath on top, install new basalt rock groyne, beach (sand) replenishment, new concrete walkway. 

Te Toro Point

Removal of existing timber retaining wall, install new timber retaining wall, install concrete footings under existing boat ramp, scour protection (concrete with hand placed stone) regrade of grass reserve, new kerb and channel, planting. 

Both of these projects came in on time and under budget with variations included.

Client

Auckland Council

Date

January - April 2019

Location

226 Torkar Rd, Clarks Beach,

Budget

$600-650K